Head Works


 

Records Found : 456


Visit of Individual Experts (Members of 'Panel of Experts' for Polavaram Irrigation Project, Andhra Pradesh) viz., Mr. David B. Paul, P.E, USA, Mr. Richard Donnelly, Canada, Mr. Gian Franco Di Cicco, USA & Mr. Sean Hinchberger, Canada to Spillway Image Date : 30-06-2024

Visit of CEO, PPA to Open Channel constructed at Downstream Cofferdam for draining out seepage water by gravity from main dam area along with officials of PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS on March 6, 2024 Image Date : 06-03-2024

Visit of CEO, PPA to Vibro Compaction area at ECRF Gap II along with officials of PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS Image Date : 06-03-2024

Visit of CEO, PPA to Vibro Compaction area at Gap II (Proposed ECRF Dam) alongwith officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS Image Date : 21-11-2023

Visit of CEO, PPA to Open Channel constructed at Downstream Cofferdam for dewatering from main dam area alongwith officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS Image Date : 21-11-2023

Visit of CEO, PPA to Upstream Cofferdam alongwith officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS Image Date : 21-11-2023

Visit of CEO, PPA along with officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Downstream Cofferdam Image Date : 17-07-2023

Visit of CEO, PPA along with officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Guide Wall of Approach Channel to Spillway Image Date : 17-07-2023

Visit of CEO, PPA along with officials of WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Gap-II Image Date : 17-07-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Pilot Channel Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Spillway Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Gap-I Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Downstream Cofferdam Image Date : 22-05-2023

CEO, PPA witnessing Piezometer readings at Ch. 350 m, offset -105 m at d/s toe of Upstream Cofferdam along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL Image Date : 22-05-2023

CEO, PPA inaugurating Vibro Compaction on upstream side of D-wall (Grid A5) of ECRF Dam Gap II Image Date : 22-05-2023

CEO, PPA witnessing the results of ECPT at grid B6 in unscoured area of ECRF Dam Gap II along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to pump-out test area at ECRF Dam Gap II Image Date : 22-05-2023

Visit of CEO, PPA to Downstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to D-Wall at Gap-I Image Date : 26-01-2023

Visit of CEO, PPA to Vibro Compacted area at Reach-1 of Upstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to D-Wall of ECRF Dam across Gap-II Image Date : 26-01-2023

Visit of CEO, PPA to Piezometer installed at Ch. 350 m and Offset -155 m at d/s toe of Upstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to Pydipaka Dump Hill at U/s of left flank of Spillway Image Date : 26-01-2023

Visit of CEO, PPA to Guide Wall of Approach Channel to Spillway Image Date : 26-01-2023

Visit of CEO, PPA to Spill Channel Image Date : 26-01-2023

Visit of CEO, PPA to Approach Channel-II of Package-65 (B) under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Saddle Dam KL of Package-66 under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Delivery Cistern of Pushkara Lift Irrigation Scheme Image Date : 30-12-2022

Visit of CEO, PPA to OT Regulator at Ch. 1.700 km of Pushkara Lift Irrigation Scheme Image Date : 30-12-2022

Visit of CEO, PPA to Cross Regulator at Ch. 1.700 km of Left Main Canal under Package-1 Image Date : 30-12-2022

Visit of CEO, PPA to Spillway Image Date : 29-12-2022

Visit of CEO, PPA to Guide Wall of Approach Channel to Spillway Image Date : 29-12-2022

Visit of CEO, PPA to Upstream Cofferdam Image Date : 29-12-2022

Visit of CEO, PPA to D-Wall of ECRF Dam across Gap-II Image Date : 29-12-2022

Visit of CEO, PPA to Downstream Cofferdam Image Date : 29-12-2022

Visit of CEO, PPA to Gap-I Image Date : 29-12-2022

Visit of CEO, PPA to NoF Concrete Dam across Gap-III Image Date : 29-12-2022

Visit of CEO, PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to right tube of Twin Tunnel of Package-63 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to right tube of Twin Tunnel of Package-64 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to OT Regulator of Package-62 under Right Connectivity Image Date : 29-12-2022

Visit of CE (P&D), PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Off Take Regulator of Package-62 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Right Tube of Twin Tunnel of Package-63 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Right Tube of Twin Tunnel of Package-64 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to proposed D-Wall at Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to dewatering area at Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to D-Wall at Gap-II Image Date : 25-11-2022

CE (P&D), PPA witnessing the result of ECPT at downstream of Upstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to trial area of SPT at downstream of Upstream Cofferdam Image Date : 25-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Downstream Cofferdam on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Gap-I on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to downstream of Upstream Cofferdam on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Spillway on November 3, 2022 Image Date : 03-11-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 10-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 10-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Guide Wall at U/s of Spillway Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Downstream Cofferdam Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Embankment Lab at Power House Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Upstream Cofferdam Image Date : 08-09-2022

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Spillway Bridge Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to ECRF Dam (Gap-I) Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to ECRF Dam (Gap-II) Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Upstream Cofferdam Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Spillway Radial Gates Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Instrumentation Gallery of Spillway Block-40 Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Drainage Gallery of Spillway Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Vibro Stone Columns Area in ECRF Dam (Gap-I) Image Date : 19-02-2021

Site Visit CEO, PPA to Spillway Deck Slab Image Date : 20-12-2020

Visit CEO, PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 20-12-2020

Visit CEO, PPA to Entry Portal of Twin Tunnel of Package-63 under Right Connectivity Image Date : 20-12-2020

CEO, PPA witnessing the Vibro Stone Columns at Downstream of ECRF Dam (Gap-I) Image Date : 20-12-2020

Visit of Member Secretary, PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 16-12-2020

Visit of Hon'ble Chief Minister of Andhra Pradesh to Spillway Image Date : 14-12-2020

Visit of Hon'ble Chief Minister of Andhra Pradesh to Deck Slab for Spillway Bridge Image Date : 14-12-2020

Visit of Member Secretary, PPA to Right Bank of Upstream Coffer Dam Image Date : 14-12-2020

Visit of Member Secretary, PPA to Deck Slab for Spillway Bridge Image Date : 14-12-2020

Visit of Member Secretary, PPA to Entry Portal of Twin Tunnel of Package-63 under Right Connectivity Image Date : 14-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Head Regulator of Package-65 (B) under Left Connectivity Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Upstream Coffer Dam Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Hydro Mechanical Yard Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to P-Head Regulator of Package-62 under Right Connectivity Image Date : 02-12-2020

Visit of Sh. Manikya Vara Prasad, MLC & Sh. Laxman Reddy, Chairman of Prohibition and Excise Department, GoAP to Spillway Image Date : 23-11-2020

Visit of Sh. Anil Kumar Yadav, H’nble Minister of Irrigation, GoAP to Spillway Block-44 Image Date : 17-11-2020

Visit of Manager (Geotech), PMCC-WAPCOS along with Officials of WRD, GoAP, M/s MEIL to ECRF Dam (Gap-I) Image Date : 31-10-2020

Discussion with representatives of Contracting Agencies regarding Epoxy Grouting in Spillway Trunnion Beam of Block-42 Image Date : 29-10-2020

Joint Checking of Reinforcement of Deck Slab for Spillway Bridge over span 40-41 by Officials of PMCC-WAPCOS Image Date : 28-10-2020

Visit of PM, PMCC-WAPCOS to Entry of Irrigation Tunnel and Approach Channel of Package-65(B) Image Date : 27-10-2020

Visit of PM, PMCC-WAPCOS to P-Head Regulator of Package-62 Image Date : 24-10-2020

Visit of CE, QAQC to Deck Slab for Spillway Bridge over span 44-45 Image Date : 10-10-2020

Visit of Geologist (GSI, Hyderabad) along with Officials of WRD, GoAP, M/s MEIL and PMCC-WAPCOS to Upstream of Power House Image Date : 07-10-2020

Visit of Sr. Manager (Geology) and Officials of PMCC-WAPCOS to NOF Dam (Gap-III) Image Date : 05-10-2020

Visit of PM, PMCC-WAPCOS to Deck Slab for Spillway Bridge over span 44-45 Image Date : 03-10-2020

Visit of CE, PIP to Irrigation Tunnel of Package-65(B) Image Date : 02-10-2020

Visit of CE, PIP to Deck Slab for Spillway Bridge over span 45-46 Image Date : 01-10-2020

Concreting (M60 & M35) & Compaction on pier of Spillway Block-38 at EL 50.78m Image Date : 30-09-2020

Excavation at Ch. 179m for Guide Wall for Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 30-09-2020

Concreting (M20) for Gate Well from EL 30.85m to EL 32.35m of Depletion Sluice of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 30-09-2020

Visit to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 30-09-2020

Shuttering & Reinforcement on Right Guide Wall of Spillway Block-50 at EL 28.52m Image Date : 29-09-2020

Observation of Daily Water Levels of River Godavari at Right Flank of Upstream Coffer Dam Image Date : 28-09-2020

Concreting (M25) in Guide Wall of Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 27-09-2020

Dewatering at Navigation Tunnel of Package-66 under Left Connectivity Image Date : 26-09-2020

Excavation for Service Road at Exit Channel of Package-65(B) under Left Connectivity Image Date : 25-09-2020

Concreting (M15) for Parapet wall from Ch. 45m to Ch. 60m of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 25-09-2020

Inspection of Deck Slab of Spillway Bridge over Span 44 to 50 Image Date : 25-09-2020

Inspection of Deck Slab of Spillway Bridge over Span 44 to 50 Image Date : 25-09-2020

Reinforcement at Pier of Spillway Block-2 at EL 33.86m Image Date : 24-09-2020

Shuttering at Trunnion Beam of Spillway Block-10 at EL 34.76m Image Date : 24-09-2020

Reinforcement at Trunnion Beam of Spillway Block-11 at EL 34.47m Image Date : 24-09-2020

Reinforcement at Trunnion Beam of Spillway Block-26 at EL 34.34m Image Date : 24-09-2020

Geological Mapping of Rock Slope at D/s Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 24-09-2020

Survey of Geological Mapping for works of Excavated Rock adjacent to Left Abutment of Protection Wall U/s & D/s at P- Head Regulator of Package-62 under Right Connectivity Image Date : 24-09-2020

Shuttering of Gate Well from EL 30.85m to EL 32.35m of Depletion Sluice of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 24-09-2020

Clearing of blasted Rock Materials from Ch. -8.00m to Ch. 50.00m at NOF Dam (Gap-III) Image Date : 24-09-2020

Shuttering for Parapet wall from Ch. 45m to Ch. 60m of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 23-09-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch. 2159m of Package-65(B) under Left Connectivity Image Date : 23-09-2020

Dewatering of Exit channel of Package-65(B) under Left Connectivity Image Date : 23-09-2020

Cleaning of Reinforcement on Left Training Wall-2/1 & 2/2 in Spillway at EL 24.69m & EL 22.53m Image Date : 23-09-2020

Concreting (M20) on Right Training Wall-50/3 in Spillway at EL 22.41m Image Date : 22-09-2020

Clearing of excavated material at Ch. 1920m of Approach Channel-2 to Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 22-09-2020

Visit of Officials (M/s APGENCO & M/s MEIL) to Power House Downstream Image Date : 22-09-2020

Concreting (M35) of Girder for Span 38 to 39 for Spillway Bridge Image Date : 22-09-2020

Curing of Girders of Spillway Bridge Image Date : 22-09-2020

Concreting (M35) & Compaction of Deck Slab over Span 47 to 48 Image Date : 22-09-2020

Excavation and Drilling for blasting at NOF Dam (Gap-III) Image Date : 21-09-2020

Shotcreting (M25) of Second Layer (50mm) at Power House D/s from RL 75m to RL 85m at Ch. 460m Image Date : 20-09-2020

Visit of Officials to NOF Dam (Gap-III) Image Date : 19-09-2020

Shuttering for Girders of Span 37 to 38 of Spillway Bridge Image Date : 19-09-2020

Geological Mapping of Excavated Rock Slope of Left Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 17-09-2020

Excavation at NOF Dam (Gap-III) Image Date : 15-09-2020

Laying of Aggregate over working platform after levelling at Stone Columns (Trial Area) in ECRF Dam (Gap-I) Image Date : 15-09-2020

Concreting (M35) & Compaction on pier of Spillway Block-50 at EL 52.92m Image Date : 15-09-2020

Reinforcement for Girders of Span 15 to 16 of Spillway Bridge Image Date : 15-09-2020

Reinforcement at Pier Portion of Spillway Block-50 at EL 52.92m Image Date : 14-09-2020

Restoration of Temporary Road infront of Spillway Block-43 Image Date : 13-09-2020

Shuttering of Deck Slab for Spillway Bridge of Span 47 to 49 Image Date : 13-09-2020

Shuttering & Reinforcement for Girders of Span 3 to 4 of Spillway Bridge Image Date : 13-09-2020

Shuttering & Reinforcement on Right Training Wall-50/3 in Spillway at EL 21.14m Image Date : 12-09-2020

Reinforcement of Deck Slab for Spillway Bridge of Span 47 to 49 Image Date : 12-09-2020

Fitup of Guide Cone for extension of Anchor Cable Duct in Spillway Block-3 Image Date : 12-09-2020

Restoration of Temporary Road infront of Spillway Block-18 Image Date : 12-09-2020

Surrvey for executed Bed Level of Approach Channel of Package-65(B) under Left Connectivity Image Date : 12-09-2020

Fitup and Welding of Vertical Stiffener Plate to Horizontal Girder of Stoplog Gates Image Date : 11-09-2020

Concreting (M20) on Right Training Wall-50/2 in Spillway at EL 21.30m Image Date : 11-09-2020

Curing of Spillway NOF Blocks 51 & 52 at EL 54.00m Image Date : 11-09-2020

Concreting (M35) in Spillway NOF Block-52 at EL 53.02m Image Date : 10-09-2020

Concreting (M20) on Right Training Wall-50/5 in Spillway at EL 21.30m Image Date : 10-09-2020

Arrival of Machinery (Hydraulic Cylinders for Spillway Radial Gates) Image Date : 10-09-2020

Soil Casing at Ch. 300m to Ch. 400m, TBL of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 09-09-2020

Survey of Bed of Navigation Tunnel of Package-66 under Left Connectivity Image Date : 09-09-2020

Shuttering & Reinforcement of Deck Slab for Spillway Bridge of Span 47 to 50 Image Date : 09-09-2020

Shuttering & Reinforcement at Spillway Block-52 at EL 53.02m Image Date : 09-09-2020

Geological Mapping of Excavated Rock Slope at U/s Left Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 08-09-2020

Fixing of Anchor Cable Duct (2nd layer) in Longitudinal Direction in Spillway Block-49 at EL 35.132m Image Date : 08-09-2020

Applying Coal Tar Epoxy paint on U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 07-09-2020

Cutting of plates for Horizontal Girder of Stoplog Gates Image Date : 07-09-2020

Grinding of Cover of Rope Drums of P-Head Regulator of Package-62 under Right Connectivity Image Date : 07-09-2020

Drilling Holes at Power House Downstream for blasting at EL 62m, Ch. 260m Image Date : 07-09-2020

Arrival of Machinery (Angle ISA 65 27 MT for Gantry Crane Edge Protection work) Image Date : 05-09-2020

Fixing of frame of Anchor rods at Trunnion in Spillway Block-50 Image Date : 05-09-2020

Sand Blasting at U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 05-09-2020

Applying Zinc Silicate Primer at U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 05-09-2020

Concreting (M35) of Girder for Span 23 to 24 for Spillway Bridge Image Date : 05-09-2020

Concreting (M35) & Compaction in Spillway NOF Block-51 at EL 53.02m Image Date : 05-09-2020

Observation of Water Levels at Spillway Approach Channel Image Date : 04-09-2020

Observation of Water Levels at Spill Channel Image Date : 04-09-2020

Upstream View of Spillway Image Date : 02-09-2020

Downstream View of Spillway Image Date : 02-09-2020

Vibro Compaction of Stone Columns (Trial Area) at Point-14 in ECRF Dam (Gap-I) Image Date : 02-09-2020

Reinforcement for Guide Wall for Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 02-09-2020

Visit of Geologist to Entry Portal of Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Visit of Geologist to Exit Portal of Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Examination of Rock Mass conditions at Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Shuttering, Fabrication & Placing of Reinforcement on Spillway Bridge of Span 49 to 50 Image Date : 01-09-2020

Clearing of excavated material at Ch. 1090m of Approach Channel-1 to Head Rregulator cum Navigation Lock of Package-65(B) under Left Connectivity Image Date : 01-09-2020

Clearing of blasted Rock Materials from Power House at EL 75m, Ch. 512m Image Date : 01-09-2020

Fitup and Welding of Additional Vertical Stiffener Plate to Horizontal Girder of Radial Gates Image Date : 01-09-2020

Fitup and Welding of primary embedded parts of Rail for Gantry Crane in Spillway Block-51 at EL 53.83m Image Date : 01-09-2020

Fitup and Welding of primary embedded parts of Rail for Gantry Crane in Spillway Block-51 at EL 53.85m Image Date : 31-08-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) to Horizontal Girder of Radial Gates at Fabrication Yard of Project Site Image Date : 27-08-2020

Shuttering, Fabrication & Placing of Steel Reinforcement of Deck Slab for Spillway Bridge in between Spillway Blocks 45-50 Image Date : 27-08-2020

Arrival of Machinery (Hydraulic Cylinders for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 26-08-2020

Arrival of Machinery (Power Pack and Local Control Panels for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 25-08-2020

Welding of Arm Girder Bracing with Gusset with 3rd and Top Arm Girder for Radial Gate at Fabrication Yard of Project Site Image Date : 10-08-2020

Concreting in Spillway Bridge Girder 20-21 C Image Date : 07-08-2020

M60 & M35 Concreting by Boom Placer on pier of Spillway Block-27 at EL 48.58m Image Date : 05-08-2020

Reinforcement in SPillway Bridge Girder 21-22C Image Date : 03-08-2020

Cutting of Rail fixture plates for Gantry Crane at Fabrication Yard of Project Site Image Date : 03-08-2020

Fitup and Welding of primary embedded parts of Stoplog Gate Vertical Groove and Radial Gate Wall Groove in Spillway Block-4 from EL 46.02m to EL 47.22m Image Date : 01-08-2020

Concreting of Grade M60 & M25 by using Boom Placer on pier of Spillway Block-2 at EL 32.12m Image Date : 01-08-2020

Clearing of muck from Power House Downstream at EL 06m, Ch. 450m Image Date : 31-07-2020

Fitup of Guide Cone for Trunnion Beam of Radial Gates for Spillway Block-8 Image Date : 31-07-2020

M60 & M25 Concreting by using Boom Placer on pier of Spillway Block-26 at EL 47.95m. Image Date : 31-07-2020

M25 Laying of Concrete by Boom Placer on Divide Wall-42 (3-5) at EL 22.75m, Image Date : 31-07-2020

M60 & M35 Concreting on pier of Spillway Block-40 at EL 49.52m Image Date : 31-07-2020

M60 & M35 Concreting by using Boom Placer on pier of Spillway Block-9 at EL 50.76m Image Date : 30-07-2020

Placingof Steel Reinforcement in Pedestal Portion of Spillway Block-10 at EL 49.90m Image Date : 29-07-2020

Spreading of sand filter at Saddle Dam E. Image Date : 28-07-2020

M60 & M25 Concreting by using Boom Placer on pier of Spillway Block-8 at EL 47.73m, Image Date : 28-07-2020

Clearing of Debris in Approach Channel-2 to Irrigation Tunnel of Package-65(B) under Left Connectivity at Ch. 1690 m. Image Date : 28-07-2020

Arrival of Machinery (Power Pack for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 27-07-2020

Compaction by using Needle Vibrator on Right Training Wall-5-5 in Spillway at EL 20.31m Image Date : 24-07-2020

Curing of Precast I Girders of Spillway Bridge Image Date : 23-07-2020

Excavation in Spill Channel for D-Wall Ch 352m to 353m Image Date : 23-07-2020

M25 Concrete by using Boom Placer and Compaction by using Needle Vibrator on Right Training Wall-3-5 in Spillway at EL 10.01m, Image Date : 22-07-2020

M60 Concreting on Spillway Bridge Girder 19-20D Image Date : 21-07-2020

Steel Reinforcement at Pier Cap of Spillway Block-39 at EL 48.66m Image Date : 20-07-2020

Steel Reinforcement of Spillway Block-28 at EL 49.69m, Image Date : 18-07-2020

Clearing of muck after blasting from Irrigation Tunnel of Package-65(B) under Left Connectivity at Ch. 2782 m. Image Date : 16-07-2020

Steel Reinforcement at Trunnion Beam of Spillway Block-7 at EL 33.83m, Image Date : 15-07-2020

Steel Reinforcement at Pier Cap of Spillway Block-41 at EL 50.81m Image Date : 13-07-2020

M25 Concrete on Divide Wall-18 (1 of 5) at EL 26.00m Image Date : 13-07-2020

Visit of Geologists from GSI, Hyderabad and Officials of M/s Max Infra, WRD, GoAP to Head Regulator of Package-65B under Left Connectivity Image Date : 13-07-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) for strengthening bottom of Horizontal Girder at Fabrication Yard of Project Site Image Date : 13-07-2020

Arrival of Machinery (Hydraulic Hoist Support Structure) at Fabrication Yard of Project Site Image Date : 13-07-2020

Clearing of Debris in Approach Channel-1 to Irrigation Tunnel or Navigation Tunnel of Package-65(B) under Left Connectivity at Ch. 830 m. Image Date : 12-07-2020

Shuttering for Precast I Girder 19-20C of Spillway Bridge Image Date : 10-07-2020

Clearing of Debris in Exit Channel of Package-65(B) under Left Connectivity at Ch. 3160m Image Date : 09-07-2020

Aerial View of Downstream Coffer Dam from Right Flank Image Date : 08-07-2020

Fixing and Alignment of Templates (2500X1820X10)mm and Anchor rods (50X1500)mm for Hydraulic Hoist Support Structure in Spillway Block-6 at EL 47.055m Image Date : 07-07-2020

Fitup of Anchor Cone for 1st Shutter of Left Abutment in Spillway Block-2 Image Date : 07-07-2020

Fabrication & Placing of Steel Reinforcement of I Girder 21-22C of Spillway Bridge at Girder Fabrication & Casting Yard Image Date : 04-07-2020

Steel Reinforcement for Diaphragm Wall at RD 2920m of Spill Channel Image Date : 02-07-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) for strengthening bottom of Horizontal Girder at Fabrication Yard of Project Site Image Date : 02-07-2020

M25 Concrete for Diaphragm Wall of Spill Channel Panel P-28 Ch. 296m to Ch. 303m Image Date : 01-07-2020

Drilling of Bore holes for Grouting at Key Portion of E- Saddle Dam Image Date : 30-06-2020

M25 Concreting in Guide Wall of ECRF Dam across Gap I. Image Date : 29-06-2020

Pilot Bore rigging using Bentonite slurry for D-Wall at RD 2920m of Spill Channel P-28 Image Date : 29-06-2020

De-Shuttering of Outer Girder 18-19 of Spillway Bridge Image Date : 28-06-2020

M25 Concrete in Diaphragm Wall at RD 2920m of Spill Channel Panel P-26 Image Date : 26-06-2020

Shuttering work of Guide Wall from Ch. 464m to 476m Image Date : 26-06-2020

Steel Reinforcement work of Spillway Block-50 at EL 50.00m, Image Date : 26-06-2020

Pre-stressing of HT strands at Guide C11 in Spillway Block-44 in Longitudinal direction Image Date : 26-06-2020

Pre-stressing of HT strands of Dia. 15.2mm at Guide C10 in Spillway Block-44 in Longitudinal direction Image Date : 26-06-2020

Excavation at Head Regulator Ds at Ch. 1550m of Package-65(B) Image Date : 24-06-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch. 2347m Image Date : 24-06-2020

Fabrication of J-rods with 200X200X10mm Plate for EM Parts of Hoist Support Structure Access Platform at Fabrication Yard of Project Site Image Date : 23-06-2020

Fabrication of Cover for Hoist of P-Head Regulator of Package-62 under Right Connectivity Image Date : 22-06-2020

Clearing of debris at Irrigation Tunnel at Ch. 2314.80m of Pkg-65B, Left Connectivity Image Date : 21-06-2020

Concreting by Boom Placer in pier of Spillway Block-3 at EL 46.17m Image Date : 20-06-2020

Concreting Outer Girder 45-46D for Spillway Bridge Image Date : 18-06-2020

Steel Reinforcement at Spillway Block-2 at EL 28.40m, Image Date : 17-06-2020

Fitup & Pre-erection assembly of Arm Girder and bracing with Trunnion Hub (G-26 LH) of Spillway Radial Gates at Fabrication Yard of Project Site Image Date : 17-06-2020

Reinforcement work for D-Wall at RD 2920m of Spill Channel Image Date : 16-06-2020

Turfing at Ds side of E-Saddle Dam from Ch. 540m to Ch. 570m Image Date : 15-06-2020

Reinforcement in Spillway Bridge Girder 48-49A Image Date : 15-06-2020

Concreting in Left Training Wall P2 Image Date : 13-06-2020

Drilling for preparation of Blasting at Ch. 1050m at Approach Channel-1 Image Date : 12-06-2020

Drilling for preparation of Blasting at Ch. 1955m at Approach Channel-2 Image Date : 12-06-2020

Concreting from EL 24.4m to EL 25.6m at Steining well of Depletion Sluice of E- Saddle Dam Image Date : 11-06-2020

Back filling and Campacting at key Portion from Ch. 655m to Ch. 700m of E- Saddle Dam Image Date : 11-06-2020

Applying Coal Tar Epoxy paint on U-s side of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard of Project Site Image Date : 11-06-2020

Steel Reinforcement work at Spillway Block-24 at EL 48.76m Image Date : 10-06-2020

Concreting by Boom Placer in pier of Spillway Block-33 at EL 46.81m, Image Date : 10-06-2020

Fixing of Rock Bolts at Power House Downstream at EL 85m, Ch. 420m. Image Date : 07-06-2020

Excavation for cleaning of Loose Clay Soil at Depletion Sluice of E- Saddle Dam Image Date : 07-06-2020

Steel Reinforcement at Pier Portion of Spillway Block-26 at EL 43.48m, Image Date : 05-06-2020

Excavation in Spill Channel for laying of CC blocks ch 2780m to 2840m Image Date : 04-06-2020

Shotcreting at Power House from EL 85m to EL 95m ch 420m Image Date : 03-06-2020

Spreading of Coarse Aggregate at the base of CC Block for Spill Channel Panel L-77-48 at Ch. 1440m Image Date : 03-06-2020

Fitup of End Arm Bracing (3530X748X12mm) between bottom and second arm girder at Fabrication Yard of Project Site Image Date : 03-06-2020

Drilling at EL 72m, Ch. 485m at Power House for blasting. Image Date : 02-06-2020

Concreting by Boom Placer of Spillway B-43 at EL 50.77m, Image Date : 02-06-2020

Applying of shuttering oil for Spill Channel Panel L-168-13 ch 2470m Image Date : 01-06-2020

Concreting of Spill Channel Panel L-166-16 at ch 2460m Image Date : 01-06-2020

Vibro Compaction at Grid B-6 of Gap-II Image Date : 01-06-2020

Clearing of muck at EL 55m, Ch. 520m of Power House Image Date : 01-06-2020

Concreting using Boom Placer on Right Training Wall-2/1 of Spillway Block-2 at EL 21.00m Image Date : 31-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-28 at EL 45.80m Image Date : 30-05-2020

Reinforcement work on Left Guide Wall of Spillway at EL 19.63m Image Date : 30-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-51 at EL 47.47m Image Date : 29-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-17 at EL 48.61m Image Date : 28-05-2020

Applying Coal Tar Epoxy paint on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 28-05-2020

Applying Coal Tar Epoxy paint on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 28-05-2020

Applying Epoxy Coal Tar on sand blasted Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard 28-5-2020 Image Date : 28-05-2020

Excavation of Trench for Construction of Diaphragm Wall at proposed location of ECRF Dam (Gap-I) Image Date : 26-05-2020

Excavation and Demucking along Left Training Wall-2/6, 2/7, 2/8 & 2/9 of Spillway Block-2 Image Date : 26-05-2020

Reinforcement works in Left Training Wall-2/5 of Spillway Block-2 at EL 14.00m Image Date : 26-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-21 at EL 48.84m Image Date : 25-05-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2500m to Ch.2600m Image Date : 25-05-2020

Excavation of Trench for Construction of Diaphragm Wall at proposed location of ECRF Dam (Gap-I) Image Date : 23-05-2020

Fitup and welding of additional vertical stiffener plate (2000x185x12)mm for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Fitup and welding of additional vertical stiffener plate (2000x185x12)mm for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Fitup and welding of additional vertical stiffener plate for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Shuttering of Steel Reinforcement at Pier Portion of Spillway Block-21 at EL 48.84m Image Date : 19-05-2020

Shuttering on Pier Portion of Spillway Block-29 at EL 45.67m Image Date : 18-05-2020

Fixing and Welding of Embedded Plate for Hydraulic Hoist Support Structure at EL 46.32m in Spillway Block-47 Image Date : 18-05-2020

Fitup and Welding of primary embedded parts at Stoplog Gate Vertical Groove and Radial Gate Wall Groove from EL 47.62m to EL 48.62m in Spillway Block-21 Image Date : 18-05-2020

Back filling with suitable soil at Depletion Sluice of Package-62 under Right Connectivity Image Date : 16-05-2020

Shuttering on Pier Portion of Spillway Block-45 at EL 50.00m Image Date : 16-05-2020

Concreting in Spill Channel for Panel-L183/7 at Ch 2630m Image Date : 16-05-2020

Shuttering for Trunnion Beam of Spillway Block-22 at EL 34.29m Image Date : 16-05-2020

Vibro Compaction of Sand Deposit at Grid A’6 in U/s of ECRF Dam across Gap - II Image Date : 15-05-2020

Fitup & Pre-erection assembly of Arm Girder and bracing with Trunnion Hub (G-3 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 15-05-2020

Reinforcement of Pre-cast Girders at Casting Yard Image Date : 15-05-2020

Laying of Concrete for Profile Wall on U/s of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 15-05-2020

Shuttering, Reinforcement for Pre-cast I Girder at Casting Yard Image Date : 14-05-2020

Reinforcement and Shuttering work on Training Wall-2/1 of Spillway Block-2 at EL 21.00m Image Date : 14-05-2020

Laying of Coarse Aggregate Filter in Spill Channel for preparation of Bed Image Date : 14-05-2020

Concreting in Spill Channel for Panel-L181/6 at Ch 2600m Image Date : 11-05-2020

Concreting of Collar Ring beams of Depletion Sluice of Package-62 under Right Connectivity Image Date : 11-05-2020

Steel Reinforcement at Pier of Spillway Block-14 at EL 44.49m Image Date : 11-05-2020

Fixing of Rope Drum Bolts for Hoist Support Structure of P-Head Regulator of Package-62 under Right Connectivity Image Date : 10-05-2020

Concreting using Boom Placer on Right Training Wall-50/2 of Spillway Block-50 at EL 13.85m Image Date : 10-05-2020

Loading Excavated Rock Material (Debris) into Tipper at Approach Channel-1 U/s at Ch 1275m of Package-65(B) under Left Connectivity Image Date : 09-05-2020

Soil Casing work at P-Head Regulator at RL 53.65m of Package-62 under Right Connectivity Image Date : 09-05-2020

Drilling in Heading Portion of Irrigation Tunnel at Ch 2431m Image Date : 08-05-2020

Drilling of Bore Holes at Ch. 1500m at Head Regulator of Approach Channel-2 of Package-65(B) under Left Connectivity Image Date : 08-05-2020

Drilling in Heading Portion of Irrigation Tunnel at Ch 2431m of Package-65(B) under Left Connectivity Image Date : 08-05-2020

Arrangement of handpacked Rip-Rap on U/s face of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 07-05-2020

Pre-ECPT work on Sand Deposit at Grid C'7 in U/s of ECRF Dam Area across Gap - II Image Date : 07-05-2020

Erection and Alignment of Trunnion Bracket with Anchor rods in Spillway Block-49 at EL 34.66m U-s and EL 35.65m D-s Image Date : 06-05-2020

Fixing and Alignment of Templates and Anchor rods for Hydraulic Hoist Support Structure at EL 47.055m in Spillway Block-3 Image Date : 06-05-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2100m to Ch.2600m Image Date : 05-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Drilling of Bore Holes at Ch. 1500m at Head Regulator of Approach Channel-2 Image Date : 04-05-2020

Loading Excavated Rock Material (Debris) into Tipper at Approach Channel-1 U/s at Ch 1275m Image Date : 04-05-2020

Loading of Excavated Rock Material (Debris) into Tipper at Approach Channel-2 U/s at Ch 1956m Image Date : 04-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Clearing of Loose Rock Materials at Ch. 490m from Power House Downstream Image Date : 04-05-2020

Erection & Alignment of Hydraulic Hoist Support Structure in Spillway Block-33 at EL 47.05m Image Date : 04-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Erection & Alignment of Hydraulic Hoist Support Structure in Spillway Block-33 at EL 47.05m 4-5-2020 Image Date : 04-05-2020

Steel Reinforcement in Trunnion Beam of Spillway Block-7 at EL 33.83m Image Date : 03-05-2020

Rip-Rap work at Upstream side of E-Saddle Dam Image Date : 30-04-2020

Rope Drum Bolts fixing at P-Head Regulator Image Date : 30-04-2020

Concreting of Ds longitudinal catch drain at EL 43.82m of Right Embankment of P-Head Regulator Image Date : 30-04-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2100m to Ch.2600m Image Date : 29-04-2020

Survey from Ch 600m to Ch 900m at Approach Channel Image Date : 28-04-2020

Survey from Ch 600m to Ch 900m at Approach Channel-1 Image Date : 28-04-2020

Rock Drilling in Panel-2 of 3 of Left Training Wall 17.02m Image Date : 21-04-2020

Concreting in Spillway Block-49 at 46.87m Image Date : 20-04-2020

Concreting in Spillway Block-49 at 46.87m. Image Date : 20-04-2020

Concreting in Spillway Block-0 EL 35.50m Image Date : 18-04-2020

Reinforcement and Shuttering in Left Training Wall-2 of 4 of Spillway Block-2 at EL 17.05m Image Date : 17-04-2020

Shuttering and of Left Guide Wall at EL 18.55m Image Date : 16-04-2020

Concreting in Spillway Block-1 at 38.15m Image Date : 13-04-2020

Reinforcement works in Pre-cast Girders at Casting Yard Image Date : 12-04-2020

Scaffolding for Shuttering at EL 94m from Ch. 2155m to Ch. 2165m at 902 G’ Hill Image Date : 11-04-2020

Concreting in Spillway Block-34 at EL +45.03m Image Date : 11-04-2020

Concreting in Spillway Block-39 at EL +42.20m Image Date : 11-04-2020

Tying of Reinforcement in I section Spillway Bridge Girder at Casting Yard Image Date : 10-04-2020

Concreting of Outer Girder of Spillway Block 10-11 for Spillway Bridge Image Date : 09-04-2020

Concreting of Outer Girder of 10-11 for Spillway Bridge Image Date : 09-04-2020

Steel Reinforcement work for Trunnion Beam of B-29 at EL 32.96m Image Date : 08-04-2020

Excavation of Spill Channel and laying of filter materials 2500 m Image Date : 06-04-2020

Shuttering for CC Blocks of Spill Channel Panel-L 173 - 6 Image Date : 06-04-2020

Concreting of CC Blocks of Spill Channel Panel- L 173-6 Image Date : 06-04-2020

Steel Reinforcement in Trunnion Beam of Spillway Block-26 at EL 32.96m Image Date : 04-04-2020

Excavation at Approach Channel-2 Upstream at Ch 1425m Image Date : 04-04-2020

Fit-up and Welding of thrust block Embedded Parts in Spillway Block-23 at EL 46.329m and EL 45.405m Image Date : 27-03-2020

Demucking of Irrigation Tunnel at Ch.2494m Image Date : 27-03-2020

Concreting of Outer Girder for Blocks 7 and 8 of Spillway Bridge Image Date : 24-03-2020

Rip-Rap work at Downstream of P-Head Regulator Image Date : 21-03-2020

Compaction at Top Bank Level from Ch.250m to Ch.400m of E-Saddle Dam Image Date : 20-03-2020

Murrum Laying at EL +43.90m from Ch.300m to Ch.390m of E-Saddle Dam Image Date : 19-03-2020

Checking Alignment of Reinforcement and Shuttering in Spillway Block-17 Image Date : 19-03-2020

Arrival of Machinery (Hydraulic Hoist Supporting Structures) at Project Site Image Date : 19-03-2020

Erection of Hoist Support structure on Spillway Block-45 at EL +47.055m Image Date : 19-03-2020

Compaction by Needle Vibrator of CC Blocks of Spill Channel Panel-L167-5 Image Date : 17-03-2020

Drilling of Holes for Rock Anchors at Upstream Guide Wall of Spillway Image Date : 17-03-2020

Excavation of Approach Channel-1 U/s at Ch.950m Image Date : 17-03-2020

Excavation of Approach Channel-2 U/s at Ch.1350m Image Date : 17-03-2020

Loading of Excavated Rock Materials into Tipper at Approach Channel-1 U/s at Ch.750m Image Date : 17-03-2020

Drilling for Preparation of Slashing R/s at Irrigation Tunnel at Ch.2530m Image Date : 17-03-2020

Drilling for Preparation of Slashing L/s at Irrigation Tunnel at Ch.2536m Image Date : 16-03-2020

Loading of Excavated Rock Materials after blasting at Approach Channel-2 U/s at Ch.1845m Image Date : 16-03-2020

Loading of Excavated Rock Materials into Dump Truck at Power House U/s from Ch.290m to Ch.320m Image Date : 16-03-2020

Concreting at Gate Well of Depletion Sluice from EL +27.85m to EL +29.35m at E-Saddle Dam Image Date : 16-03-2020

Drilling for Preparation of Benching Blast at Irrigation Tunnel at Ch.2636m Image Date : 16-03-2020

Concreting of Outer Girder for Blocks 26 and 27 of Spillway Bridge Image Date : 15-03-2020

Concreting at Parapet Wall of P-Head Regulator Image Date : 14-03-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch.2545m Image Date : 14-03-2020

Shuttering of Gate Well at EL +29.35m at Depletion Sluice of E-Saddle Dam Image Date : 14-03-2020

Shuttering for Hand Rails at EL +53.530m at Downstream of P-Head Regulator Image Date : 14-03-2020

Rock Bolting in Irrigation Tunnel at Ch.2620m Image Date : 14-03-2020

Concreting in Hand Rail Columns at Downstream of P-Head Regulator Image Date : 13-03-2020

Revertment at RL +28.1m from Ch.270m to Ch.330m at 1st Berm of Downstream of E-Saddle Dam Image Date : 13-03-2020

Steel Binding of Inner Girders Image Date : 13-03-2020

Concreting of Hand Rail Columns (0.30.2m) at Downstream of P-Head Regulator Image Date : 13-03-2020

Dressing and Trimming of Slope at Downstream face of E-Saddle Dam from Ch.300m to Ch.350m Image Date : 12-03-2020

Rip-Rap work at Downstream of E-Saddle Dam in between Ch.130m to Ch.150m Image Date : 11-03-2020

Concreting of Inner Girder of Blocks 26 to 27 for Spillway Bridge Image Date : 09-03-2020

Applying Zinc Silicate Primer on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 08-03-2020

Shuttering of RCC Collars at Depletion Sluice of E-Saddle Dam Image Date : 06-03-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 06-03-2020

Vibro Compaction of Sand Deposit at Downstream River Bed of Diaphragm Wall for ECRF Dam across Gap – II Image Date : 06-03-2020

Concreting of Left Guide Wall in Spillway Upstream adjacent to Fish Pass at EL +15.30m Image Date : 05-03-2020

Joint Measurement of Spillway Divide Wall-18-1 Image Date : 05-03-2020

Compaction of Impervious Soil with Vibratory Roller from Ch.1560m to Ch.1660m at Upstream Coffer Dam Image Date : 04-03-2020

Laying of Impervious soil on Core Zone at EL 30.89m of Upstream Coffer Dam from Ch.1500m to Ch.1600m Image Date : 04-03-2020

Pre-ECPT work on Sand Deposit at Downstream of ECRF Dam at Grid C'14 Image Date : 03-03-2020

Sand Blasting of Horizontal Girder of Spillway Radial Gates at Fabrication Yard Image Date : 03-03-2020

Checking Discharge of Stagnant Water of Foundation Gallery of Spillway Block-26 Image Date : 03-03-2020

Restoration of Temporary Road near Divide Wall of Spillway Block-42 Image Date : 03-03-2020

Placement of Rockfill and Levelling at Upstream Coffer Dam from Ch.1520m to Ch.1600m Image Date : 02-03-2020

Compaction by Needle Vibrator at EL +34.45m of Spillway Block-1 Image Date : 01-03-2020

Compaction by Needle Vibrator at EL +43.26m of Spillway Block-17 Image Date : 01-03-2020

Bore Hole Drilling at Left Flank of Upstream Coffer Dam at Ch.48.30m for design of type of Cut-off Image Date : 01-03-2020

Applying Epoxy Coal Tar on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 01-03-2020

Extension of Anchorage cable duct 12m to 13.5mof 1st and 2nd layer at Spillway Block-13 Image Date : 01-03-2020

Cement Concreting of Blocks of Spill Channel Panel-L8-26 Image Date : 01-03-2020

Concreting on Divide Wall 18-2 of Spillway at EL +16.938m Image Date : 29-02-2020

Concreting on Spillway Block-6 at EL +35.230m Image Date : 29-02-2020

Concreting of Spillway Block-50 at EL +38.057m Image Date : 29-02-2020

Cleaning of Loose Rock Materials at Power House at Ch.200m Image Date : 29-02-2020

Fit-up of Embedded Parts for Radial Gate or Stoplog Gate LHS & RHS in Spillway Block-32 at EL +45.405m Image Date : 29-02-2020

Dressing and Slope trimming on D/s face of E-Saddle Dam at Ch.500m to Ch.540m Image Date : 29-02-2020

Compaction by Needle Vibrator at Spillway Block-27 at EL +41.988 m Image Date : 28-02-2020

Bhoomi Pooja at Spill Channel to start Concreting on Panel-L 9-26 at Ch.460m Image Date : 28-02-2020

Plain Cement Concreting on Panel-L 9-26 of Spill Channel at Ch.460m Image Date : 28-02-2020

Backfill Concreting of Block-1 of Spillway at EL +34.381m Image Date : 27-02-2020

Drilling at Power House Upstream for Excavation of Rock by Blasting at Ch.335m Image Date : 27-02-2020

Concreting of Steining Well of Depletion Sluice in E-Saddle Dam Image Date : 27-02-2020

Cleaning of Reinforcement of Divide Wall 18/5 of Spillway at EL +16.3m Image Date : 26-02-2020

Shuttering for Chute at Downstream Side of P-Head Regulator Image Date : 25-02-2020

Shuttering of Steining Well of Depletion Sluice in E-Saddle Dam Image Date : 25-02-2020

Fine Filter permeability Test at Upstream Side of Upstream Coffer Dam at Ch.1350m Image Date : 25-02-2020

Checking of Reinforcement of Spillway Block-18-1 at EL +14.95 m. (Divide Wall) Image Date : 18-02-2020

Excavation of Approach Channel-1 Upstream at Ch.750m of Package-65(B) Image Date : 15-02-2020

Excavation of Approach Channel-2 Upstream at Ch.1350m Image Date : 15-02-2020

Removal of Loose Rock Materials at Approach Channel-2 Upstream at Ch.1950m Image Date : 15-02-2020

Removal of Loose Rock Materials after Heading Blast at Irrigation Tunnel at Ch.2557m of Package-65(B) Image Date : 15-02-2020

Excavation in Heading of Irrigation Tunnel of Package-65(B) Image Date : 15-02-2020

Drilling for Benching in Irrigation Tunnel of Package-65(B) Image Date : 15-02-2020

Reinforcement in Gallery Portion of Spillway Block-51 at EL +34.85 m Image Date : 14-02-2020

Shuttering of Pier of Spillway Block-40 at EL + 38.39 m Image Date : 14-02-2020

Reinforcement and Shuttering of Pier of Spillway Block-14 at EL +36.908 m Image Date : 13-02-2020

Status of Spillway Block-26 before start of Concreting at EL +34.773 m Image Date : 13-02-2020

Inspection of Hoist Support Arrangement for Radial Gates on SpillwayBlock-43 at EL +47.055 m Image Date : 11-02-2020

Binding of Reinforcement of Spillway Block-18-2 at EL +16.398 m.(Divide Wall) Image Date : 11-02-2020

Checking of Reinforcement details of Spillway Block-6 at EL +38.04m Image Date : 09-02-2020

Bore Hole with Cores for finalization of Cut-off at Left Flank of Upstream Coffer Dam at Ch.(-)10m Image Date : 09-02-2020

Inspection of Hoist Support Structure on Spillway Block-43 at EL +47.055 m Image Date : 07-02-2020

Extension of Anchorage Cable Duct of size 12 to 13.5 m of 1st and 2nd layer at Spillway Block-13 Image Date : 07-02-2020

Joint Measurement of Spillway Block Levels Image Date : 07-02-2020

Erection of Hoist Support structure on Spillway Block-43 at EL +47.055 m Image Date : 06-02-2020

Welding of Arm Girder Bracing (G-05 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 05-02-2020

Rock Density Test on Downstream Side of Upstream Coffer Dam at Ch.693m Image Date : 05-02-2020

Excavation for laying of MS pipe at culvert of Right Flank of Upstream Cofferdam Image Date : 04-02-2020

Fit-up and Welding of Primary EM parts at Stoplog Gate vertical groove on Spillway Block-32 at EL +44.98 m Image Date : 04-02-2020

Applying Zinc Silicate Primer on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-02-2020

Fit-up of Walkway Base Plate in Spillway Block-4 at EL +33.4m Image Date : 03-02-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 03-02-2020

Pre ECPT work on Downstream of ECRF at Grid No.C'11 Image Date : 03-02-2020

Vibro-Compaction on Downstream side of Diaphragm Wall (Gap – II) at Grid No.C’10 Image Date : 02-02-2020

Fit-up of Arm Girder Bracing (G-5 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 02-02-2020

Fit-up and Welding of thrust block Embedded Parts in Spillway Block-47 at EL+35.5m Image Date : 01-02-2020

Welding of End Arm Bracing of Spillway Radial Gates at Fabrication Yard Image Date : 01-02-2020

Core cutting test in Core Zone of Upstream Coffer Dam at Ch.800m Image Date : 01-02-2020

Inspection of Right Side Guide Wall Image Date : 01-02-2020

Test-2 Image Date : 10-01-2018