Head Works


 

Records Found : 447


Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Pilot Channel Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Spillway Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Gap-I Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to Downstream Cofferdam Image Date : 22-05-2023

CEO, PPA witnessing Piezometer readings at Ch. 350 m, offset -105 m at d/s toe of Upstream Cofferdam along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL Image Date : 22-05-2023

CEO, PPA inaugurating Vibro Compaction on upstream side of D-wall (Grid A5) of ECRF Dam Gap II Image Date : 22-05-2023

CEO, PPA witnessing the results of ECPT at grid B6 in unscoured area of ECRF Dam Gap II along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL Image Date : 22-05-2023

Visit of CEO, PPA along with officials of CSMRS, WRD, GoAP, PMCC-WAPCOS & M/s MEIL to pump-out test area at ECRF Dam Gap II Image Date : 22-05-2023

Visit of CEO, PPA to Downstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to D-Wall at Gap-I Image Date : 26-01-2023

Visit of CEO, PPA to Vibro Compacted area at Reach-1 of Upstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to D-Wall of ECRF Dam across Gap-II Image Date : 26-01-2023

Visit of CEO, PPA to Piezometer installed at Ch. 350 m and Offset -155 m at d/s toe of Upstream Cofferdam Image Date : 26-01-2023

Visit of CEO, PPA to Pydipaka Dump Hill at U/s of left flank of Spillway Image Date : 26-01-2023

Visit of CEO, PPA to Guide Wall of Approach Channel to Spillway Image Date : 26-01-2023

Visit of CEO, PPA to Spill Channel Image Date : 26-01-2023

Visit of CEO, PPA to Approach Channel-II of Package-65 (B) under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Saddle Dam KL of Package-66 under Left Connectivity Image Date : 30-12-2022

Visit of CEO, PPA to Delivery Cistern of Pushkara Lift Irrigation Scheme Image Date : 30-12-2022

Visit of CEO, PPA to OT Regulator at Ch. 1.700 km of Pushkara Lift Irrigation Scheme Image Date : 30-12-2022

Visit of CEO, PPA to Cross Regulator at Ch. 1.700 km of Left Main Canal under Package-1 Image Date : 30-12-2022

Visit of CEO, PPA to Spillway Image Date : 29-12-2022

Visit of CEO, PPA to Guide Wall of Approach Channel to Spillway Image Date : 29-12-2022

Visit of CEO, PPA to Upstream Cofferdam Image Date : 29-12-2022

Visit of CEO, PPA to D-Wall of ECRF Dam across Gap-II Image Date : 29-12-2022

Visit of CEO, PPA to Downstream Cofferdam Image Date : 29-12-2022

Visit of CEO, PPA to Gap-I Image Date : 29-12-2022

Visit of CEO, PPA to NoF Concrete Dam across Gap-III Image Date : 29-12-2022

Visit of CEO, PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to right tube of Twin Tunnel of Package-63 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to right tube of Twin Tunnel of Package-64 under Right Connectivity Image Date : 29-12-2022

Visit of CEO, PPA to OT Regulator of Package-62 under Right Connectivity Image Date : 29-12-2022

Visit of CE (P&D), PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Off Take Regulator of Package-62 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Right Tube of Twin Tunnel of Package-63 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Right Tube of Twin Tunnel of Package-64 under Right Connectivity Image Date : 26-11-2022

Visit of CE (P&D), PPA to Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to proposed D-Wall at Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to dewatering area at Downstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to D-Wall at Gap-II Image Date : 25-11-2022

CE (P&D), PPA witnessing the result of ECPT at downstream of Upstream Cofferdam Image Date : 25-11-2022

Visit of CE (P&D), PPA to trial area of SPT at downstream of Upstream Cofferdam Image Date : 25-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Downstream Cofferdam on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Gap-I on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to downstream of Upstream Cofferdam on November 3, 2022 Image Date : 03-11-2022

Visit of Sh. Anil Jain, Chief Engineer, CWC along with other officials of CWC, CSMRS, PPA, WRD, GoAP, M/s MEIL & PMCC-WAPCOS to Spillway on November 3, 2022 Image Date : 03-11-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 10-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 10-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Guide Wall at U/s of Spillway Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Downstream Cofferdam Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Embankment Lab at Power House Image Date : 08-09-2022

Visit of Member Secretary, PPA and Chief Engineer (P&D), PPA to Upstream Cofferdam Image Date : 08-09-2022

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Spillway Bridge Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to ECRF Dam (Gap-I) Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to ECRF Dam (Gap-II) Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Upstream Cofferdam Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Spillway Radial Gates Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Instrumentation Gallery of Spillway Block-40 Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to Drainage Gallery of Spillway Image Date : 19-02-2021

Visit of Sh. A B Pandya, Chaiman, DDRP, Sh. D P Bharghava, Member, DDRP, Sh. J Chandrashekhar Iyer, CEO, PPA & Officials from CWC, CSMRS, CWPRS, WRD, GoAP, M/s MEIL, PMCC-WAPCOS, Designers and other members of 16th DDRP to to Vibro Stone Columns Area in ECRF Dam (Gap-I) Image Date : 19-02-2021

Site Visit CEO, PPA to Spillway Deck Slab Image Date : 20-12-2020

Visit CEO, PPA to P-Head Regulator of Package-62 under Right Connectivity Image Date : 20-12-2020

Visit CEO, PPA to Entry Portal of Twin Tunnel of Package-63 under Right Connectivity Image Date : 20-12-2020

CEO, PPA witnessing the Vibro Stone Columns at Downstream of ECRF Dam (Gap-I) Image Date : 20-12-2020

Visit of Member Secretary, PPA to Irrigation Tunnel of Package-65 (B) under Left Connectivity Image Date : 16-12-2020

Visit of Hon'ble Chief Minister of Andhra Pradesh to Spillway Image Date : 14-12-2020

Visit of Hon'ble Chief Minister of Andhra Pradesh to Deck Slab for Spillway Bridge Image Date : 14-12-2020

Visit of Member Secretary, PPA to Right Bank of Upstream Coffer Dam Image Date : 14-12-2020

Visit of Member Secretary, PPA to Deck Slab for Spillway Bridge Image Date : 14-12-2020

Visit of Member Secretary, PPA to Entry Portal of Twin Tunnel of Package-63 under Right Connectivity Image Date : 14-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Head Regulator of Package-65 (B) under Left Connectivity Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Upstream Coffer Dam Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to Hydro Mechanical Yard Image Date : 02-12-2020

Visit of Sh. A K Pradhan, Chief Engineer (Planning & Design) to P-Head Regulator of Package-62 under Right Connectivity Image Date : 02-12-2020

Visit of Sh. Manikya Vara Prasad, MLC & Sh. Laxman Reddy, Chairman of Prohibition and Excise Department, GoAP to Spillway Image Date : 23-11-2020

Visit of Sh. Anil Kumar Yadav, H’nble Minister of Irrigation, GoAP to Spillway Block-44 Image Date : 17-11-2020

Visit of Manager (Geotech), PMCC-WAPCOS along with Officials of WRD, GoAP, M/s MEIL to ECRF Dam (Gap-I) Image Date : 31-10-2020

Discussion with representatives of Contracting Agencies regarding Epoxy Grouting in Spillway Trunnion Beam of Block-42 Image Date : 29-10-2020

Joint Checking of Reinforcement of Deck Slab for Spillway Bridge over span 40-41 by Officials of PMCC-WAPCOS Image Date : 28-10-2020

Visit of PM, PMCC-WAPCOS to Entry of Irrigation Tunnel and Approach Channel of Package-65(B) Image Date : 27-10-2020

Visit of PM, PMCC-WAPCOS to P-Head Regulator of Package-62 Image Date : 24-10-2020

Visit of CE, QAQC to Deck Slab for Spillway Bridge over span 44-45 Image Date : 10-10-2020

Visit of Geologist (GSI, Hyderabad) along with Officials of WRD, GoAP, M/s MEIL and PMCC-WAPCOS to Upstream of Power House Image Date : 07-10-2020

Visit of Sr. Manager (Geology) and Officials of PMCC-WAPCOS to NOF Dam (Gap-III) Image Date : 05-10-2020

Visit of PM, PMCC-WAPCOS to Deck Slab for Spillway Bridge over span 44-45 Image Date : 03-10-2020

Visit of CE, PIP to Irrigation Tunnel of Package-65(B) Image Date : 02-10-2020

Visit of CE, PIP to Deck Slab for Spillway Bridge over span 45-46 Image Date : 01-10-2020

Concreting (M60 & M35) & Compaction on pier of Spillway Block-38 at EL 50.78m Image Date : 30-09-2020

Excavation at Ch. 179m for Guide Wall for Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 30-09-2020

Concreting (M20) for Gate Well from EL 30.85m to EL 32.35m of Depletion Sluice of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 30-09-2020

Visit to Navigation Tunnel of Package-66 under Left Connectivity Image Date : 30-09-2020

Shuttering & Reinforcement on Right Guide Wall of Spillway Block-50 at EL 28.52m Image Date : 29-09-2020

Observation of Daily Water Levels of River Godavari at Right Flank of Upstream Coffer Dam Image Date : 28-09-2020

Concreting (M25) in Guide Wall of Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 27-09-2020

Dewatering at Navigation Tunnel of Package-66 under Left Connectivity Image Date : 26-09-2020

Excavation for Service Road at Exit Channel of Package-65(B) under Left Connectivity Image Date : 25-09-2020

Concreting (M15) for Parapet wall from Ch. 45m to Ch. 60m of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 25-09-2020

Inspection of Deck Slab of Spillway Bridge over Span 44 to 50 Image Date : 25-09-2020

Inspection of Deck Slab of Spillway Bridge over Span 44 to 50 Image Date : 25-09-2020

Reinforcement at Pier of Spillway Block-2 at EL 33.86m Image Date : 24-09-2020

Shuttering at Trunnion Beam of Spillway Block-10 at EL 34.76m Image Date : 24-09-2020

Reinforcement at Trunnion Beam of Spillway Block-11 at EL 34.47m Image Date : 24-09-2020

Reinforcement at Trunnion Beam of Spillway Block-26 at EL 34.34m Image Date : 24-09-2020

Geological Mapping of Rock Slope at D/s Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 24-09-2020

Survey of Geological Mapping for works of Excavated Rock adjacent to Left Abutment of Protection Wall U/s & D/s at P- Head Regulator of Package-62 under Right Connectivity Image Date : 24-09-2020

Shuttering of Gate Well from EL 30.85m to EL 32.35m of Depletion Sluice of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 24-09-2020

Clearing of blasted Rock Materials from Ch. -8.00m to Ch. 50.00m at NOF Dam (Gap-III) Image Date : 24-09-2020

Shuttering for Parapet wall from Ch. 45m to Ch. 60m of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 23-09-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch. 2159m of Package-65(B) under Left Connectivity Image Date : 23-09-2020

Dewatering of Exit channel of Package-65(B) under Left Connectivity Image Date : 23-09-2020

Cleaning of Reinforcement on Left Training Wall-2/1 & 2/2 in Spillway at EL 24.69m & EL 22.53m Image Date : 23-09-2020

Concreting (M20) on Right Training Wall-50/3 in Spillway at EL 22.41m Image Date : 22-09-2020

Clearing of excavated material at Ch. 1920m of Approach Channel-2 to Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 22-09-2020

Visit of Officials (M/s APGENCO & M/s MEIL) to Power House Downstream Image Date : 22-09-2020

Concreting (M35) of Girder for Span 38 to 39 for Spillway Bridge Image Date : 22-09-2020

Curing of Girders of Spillway Bridge Image Date : 22-09-2020

Concreting (M35) & Compaction of Deck Slab over Span 47 to 48 Image Date : 22-09-2020

Excavation and Drilling for blasting at NOF Dam (Gap-III) Image Date : 21-09-2020

Shotcreting (M25) of Second Layer (50mm) at Power House D/s from RL 75m to RL 85m at Ch. 460m Image Date : 20-09-2020

Visit of Officials to NOF Dam (Gap-III) Image Date : 19-09-2020

Shuttering for Girders of Span 37 to 38 of Spillway Bridge Image Date : 19-09-2020

Geological Mapping of Excavated Rock Slope of Left Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 17-09-2020

Excavation at NOF Dam (Gap-III) Image Date : 15-09-2020

Laying of Aggregate over working platform after levelling at Stone Columns (Trial Area) in ECRF Dam (Gap-I) Image Date : 15-09-2020

Concreting (M35) & Compaction on pier of Spillway Block-50 at EL 52.92m Image Date : 15-09-2020

Reinforcement for Girders of Span 15 to 16 of Spillway Bridge Image Date : 15-09-2020

Reinforcement at Pier Portion of Spillway Block-50 at EL 52.92m Image Date : 14-09-2020

Restoration of Temporary Road infront of Spillway Block-43 Image Date : 13-09-2020

Shuttering of Deck Slab for Spillway Bridge of Span 47 to 49 Image Date : 13-09-2020

Shuttering & Reinforcement for Girders of Span 3 to 4 of Spillway Bridge Image Date : 13-09-2020

Shuttering & Reinforcement on Right Training Wall-50/3 in Spillway at EL 21.14m Image Date : 12-09-2020

Reinforcement of Deck Slab for Spillway Bridge of Span 47 to 49 Image Date : 12-09-2020

Fitup of Guide Cone for extension of Anchor Cable Duct in Spillway Block-3 Image Date : 12-09-2020

Restoration of Temporary Road infront of Spillway Block-18 Image Date : 12-09-2020

Surrvey for executed Bed Level of Approach Channel of Package-65(B) under Left Connectivity Image Date : 12-09-2020

Fitup and Welding of Vertical Stiffener Plate to Horizontal Girder of Stoplog Gates Image Date : 11-09-2020

Concreting (M20) on Right Training Wall-50/2 in Spillway at EL 21.30m Image Date : 11-09-2020

Curing of Spillway NOF Blocks 51 & 52 at EL 54.00m Image Date : 11-09-2020

Concreting (M35) in Spillway NOF Block-52 at EL 53.02m Image Date : 10-09-2020

Concreting (M20) on Right Training Wall-50/5 in Spillway at EL 21.30m Image Date : 10-09-2020

Arrival of Machinery (Hydraulic Cylinders for Spillway Radial Gates) Image Date : 10-09-2020

Soil Casing at Ch. 300m to Ch. 400m, TBL of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 09-09-2020

Survey of Bed of Navigation Tunnel of Package-66 under Left Connectivity Image Date : 09-09-2020

Shuttering & Reinforcement of Deck Slab for Spillway Bridge of Span 47 to 50 Image Date : 09-09-2020

Shuttering & Reinforcement at Spillway Block-52 at EL 53.02m Image Date : 09-09-2020

Geological Mapping of Excavated Rock Slope at U/s Left Abutment of P-Head Regulator of Package-62 under Right Connectivity Image Date : 08-09-2020

Fixing of Anchor Cable Duct (2nd layer) in Longitudinal Direction in Spillway Block-49 at EL 35.132m Image Date : 08-09-2020

Applying Coal Tar Epoxy paint on U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 07-09-2020

Cutting of plates for Horizontal Girder of Stoplog Gates Image Date : 07-09-2020

Grinding of Cover of Rope Drums of P-Head Regulator of Package-62 under Right Connectivity Image Date : 07-09-2020

Drilling Holes at Power House Downstream for blasting at EL 62m, Ch. 260m Image Date : 07-09-2020

Arrival of Machinery (Angle ISA 65 27 MT for Gantry Crane Edge Protection work) Image Date : 05-09-2020

Fixing of frame of Anchor rods at Trunnion in Spillway Block-50 Image Date : 05-09-2020

Sand Blasting at U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 05-09-2020

Applying Zinc Silicate Primer at U/s side of Skin Plate Leaf of Spillway Radial Gates Image Date : 05-09-2020

Concreting (M35) of Girder for Span 23 to 24 for Spillway Bridge Image Date : 05-09-2020

Concreting (M35) & Compaction in Spillway NOF Block-51 at EL 53.02m Image Date : 05-09-2020

Observation of Water Levels at Spillway Approach Channel Image Date : 04-09-2020

Observation of Water Levels at Spill Channel Image Date : 04-09-2020

Upstream View of Spillway Image Date : 02-09-2020

Downstream View of Spillway Image Date : 02-09-2020

Vibro Compaction of Stone Columns (Trial Area) at Point-14 in ECRF Dam (Gap-I) Image Date : 02-09-2020

Reinforcement for Guide Wall for Diaphragm Wall of ECRF Dam (Gap-I) Image Date : 02-09-2020

Visit of Geologist to Entry Portal of Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Visit of Geologist to Exit Portal of Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Examination of Rock Mass conditions at Irrigation Tunnel of Package-65(B) under Left Connectivity Image Date : 02-09-2020

Shuttering, Fabrication & Placing of Reinforcement on Spillway Bridge of Span 49 to 50 Image Date : 01-09-2020

Clearing of excavated material at Ch. 1090m of Approach Channel-1 to Head Rregulator cum Navigation Lock of Package-65(B) under Left Connectivity Image Date : 01-09-2020

Clearing of blasted Rock Materials from Power House at EL 75m, Ch. 512m Image Date : 01-09-2020

Fitup and Welding of Additional Vertical Stiffener Plate to Horizontal Girder of Radial Gates Image Date : 01-09-2020

Fitup and Welding of primary embedded parts of Rail for Gantry Crane in Spillway Block-51 at EL 53.83m Image Date : 01-09-2020

Fitup and Welding of primary embedded parts of Rail for Gantry Crane in Spillway Block-51 at EL 53.85m Image Date : 31-08-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) to Horizontal Girder of Radial Gates at Fabrication Yard of Project Site Image Date : 27-08-2020

Shuttering, Fabrication & Placing of Steel Reinforcement of Deck Slab for Spillway Bridge in between Spillway Blocks 45-50 Image Date : 27-08-2020

Arrival of Machinery (Hydraulic Cylinders for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 26-08-2020

Arrival of Machinery (Power Pack and Local Control Panels for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 25-08-2020

Welding of Arm Girder Bracing with Gusset with 3rd and Top Arm Girder for Radial Gate at Fabrication Yard of Project Site Image Date : 10-08-2020

Concreting in Spillway Bridge Girder 20-21 C Image Date : 07-08-2020

M60 & M35 Concreting by Boom Placer on pier of Spillway Block-27 at EL 48.58m Image Date : 05-08-2020

Reinforcement in SPillway Bridge Girder 21-22C Image Date : 03-08-2020

Cutting of Rail fixture plates for Gantry Crane at Fabrication Yard of Project Site Image Date : 03-08-2020

Fitup and Welding of primary embedded parts of Stoplog Gate Vertical Groove and Radial Gate Wall Groove in Spillway Block-4 from EL 46.02m to EL 47.22m Image Date : 01-08-2020

Concreting of Grade M60 & M25 by using Boom Placer on pier of Spillway Block-2 at EL 32.12m Image Date : 01-08-2020

Clearing of muck from Power House Downstream at EL 06m, Ch. 450m Image Date : 31-07-2020

Fitup of Guide Cone for Trunnion Beam of Radial Gates for Spillway Block-8 Image Date : 31-07-2020

M60 & M25 Concreting by using Boom Placer on pier of Spillway Block-26 at EL 47.95m. Image Date : 31-07-2020

M25 Laying of Concrete by Boom Placer on Divide Wall-42 (3-5) at EL 22.75m, Image Date : 31-07-2020

M60 & M35 Concreting on pier of Spillway Block-40 at EL 49.52m Image Date : 31-07-2020

M60 & M35 Concreting by using Boom Placer on pier of Spillway Block-9 at EL 50.76m Image Date : 30-07-2020

Placingof Steel Reinforcement in Pedestal Portion of Spillway Block-10 at EL 49.90m Image Date : 29-07-2020

Spreading of sand filter at Saddle Dam E. Image Date : 28-07-2020

M60 & M25 Concreting by using Boom Placer on pier of Spillway Block-8 at EL 47.73m, Image Date : 28-07-2020

Clearing of Debris in Approach Channel-2 to Irrigation Tunnel of Package-65(B) under Left Connectivity at Ch. 1690 m. Image Date : 28-07-2020

Arrival of Machinery (Power Pack for Spillway Radial Gates) at Fabrication Yard of Project Site Image Date : 27-07-2020

Compaction by using Needle Vibrator on Right Training Wall-5-5 in Spillway at EL 20.31m Image Date : 24-07-2020

Curing of Precast I Girders of Spillway Bridge Image Date : 23-07-2020

Excavation in Spill Channel for D-Wall Ch 352m to 353m Image Date : 23-07-2020

M25 Concrete by using Boom Placer and Compaction by using Needle Vibrator on Right Training Wall-3-5 in Spillway at EL 10.01m, Image Date : 22-07-2020

M60 Concreting on Spillway Bridge Girder 19-20D Image Date : 21-07-2020

Steel Reinforcement at Pier Cap of Spillway Block-39 at EL 48.66m Image Date : 20-07-2020

Steel Reinforcement of Spillway Block-28 at EL 49.69m, Image Date : 18-07-2020

Clearing of muck after blasting from Irrigation Tunnel of Package-65(B) under Left Connectivity at Ch. 2782 m. Image Date : 16-07-2020

Steel Reinforcement at Trunnion Beam of Spillway Block-7 at EL 33.83m, Image Date : 15-07-2020

Steel Reinforcement at Pier Cap of Spillway Block-41 at EL 50.81m Image Date : 13-07-2020

M25 Concrete on Divide Wall-18 (1 of 5) at EL 26.00m Image Date : 13-07-2020

Visit of Geologists from GSI, Hyderabad and Officials of M/s Max Infra, WRD, GoAP to Head Regulator of Package-65B under Left Connectivity Image Date : 13-07-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) for strengthening bottom of Horizontal Girder at Fabrication Yard of Project Site Image Date : 13-07-2020

Arrival of Machinery (Hydraulic Hoist Support Structure) at Fabrication Yard of Project Site Image Date : 13-07-2020

Clearing of Debris in Approach Channel-1 to Irrigation Tunnel or Navigation Tunnel of Package-65(B) under Left Connectivity at Ch. 830 m. Image Date : 12-07-2020

Shuttering for Precast I Girder 19-20C of Spillway Bridge Image Date : 10-07-2020

Clearing of Debris in Exit Channel of Package-65(B) under Left Connectivity at Ch. 3160m Image Date : 09-07-2020

Aerial View of Downstream Coffer Dam from Right Flank Image Date : 08-07-2020

Fixing and Alignment of Templates (2500X1820X10)mm and Anchor rods (50X1500)mm for Hydraulic Hoist Support Structure in Spillway Block-6 at EL 47.055m Image Date : 07-07-2020

Fitup of Anchor Cone for 1st Shutter of Left Abutment in Spillway Block-2 Image Date : 07-07-2020

Fabrication & Placing of Steel Reinforcement of I Girder 21-22C of Spillway Bridge at Girder Fabrication & Casting Yard Image Date : 04-07-2020

Steel Reinforcement for Diaphragm Wall at RD 2920m of Spill Channel Image Date : 02-07-2020

Fitup & Welding of Additional Vertical Stiffener Plate (2000X180X12mm) for strengthening bottom of Horizontal Girder at Fabrication Yard of Project Site Image Date : 02-07-2020

M25 Concrete for Diaphragm Wall of Spill Channel Panel P-28 Ch. 296m to Ch. 303m Image Date : 01-07-2020

Drilling of Bore holes for Grouting at Key Portion of E- Saddle Dam Image Date : 30-06-2020

M25 Concreting in Guide Wall of ECRF Dam across Gap I. Image Date : 29-06-2020

Pilot Bore rigging using Bentonite slurry for D-Wall at RD 2920m of Spill Channel P-28 Image Date : 29-06-2020

De-Shuttering of Outer Girder 18-19 of Spillway Bridge Image Date : 28-06-2020

M25 Concrete in Diaphragm Wall at RD 2920m of Spill Channel Panel P-26 Image Date : 26-06-2020

Shuttering work of Guide Wall from Ch. 464m to 476m Image Date : 26-06-2020

Steel Reinforcement work of Spillway Block-50 at EL 50.00m, Image Date : 26-06-2020

Pre-stressing of HT strands at Guide C11 in Spillway Block-44 in Longitudinal direction Image Date : 26-06-2020

Pre-stressing of HT strands of Dia. 15.2mm at Guide C10 in Spillway Block-44 in Longitudinal direction Image Date : 26-06-2020

Excavation at Head Regulator Ds at Ch. 1550m of Package-65(B) Image Date : 24-06-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch. 2347m Image Date : 24-06-2020

Fabrication of J-rods with 200X200X10mm Plate for EM Parts of Hoist Support Structure Access Platform at Fabrication Yard of Project Site Image Date : 23-06-2020

Fabrication of Cover for Hoist of P-Head Regulator of Package-62 under Right Connectivity Image Date : 22-06-2020

Clearing of debris at Irrigation Tunnel at Ch. 2314.80m of Pkg-65B, Left Connectivity Image Date : 21-06-2020

Concreting by Boom Placer in pier of Spillway Block-3 at EL 46.17m Image Date : 20-06-2020

Concreting Outer Girder 45-46D for Spillway Bridge Image Date : 18-06-2020

Steel Reinforcement at Spillway Block-2 at EL 28.40m, Image Date : 17-06-2020

Fitup & Pre-erection assembly of Arm Girder and bracing with Trunnion Hub (G-26 LH) of Spillway Radial Gates at Fabrication Yard of Project Site Image Date : 17-06-2020

Reinforcement work for D-Wall at RD 2920m of Spill Channel Image Date : 16-06-2020

Turfing at Ds side of E-Saddle Dam from Ch. 540m to Ch. 570m Image Date : 15-06-2020

Reinforcement in Spillway Bridge Girder 48-49A Image Date : 15-06-2020

Concreting in Left Training Wall P2 Image Date : 13-06-2020

Drilling for preparation of Blasting at Ch. 1050m at Approach Channel-1 Image Date : 12-06-2020

Drilling for preparation of Blasting at Ch. 1955m at Approach Channel-2 Image Date : 12-06-2020

Concreting from EL 24.4m to EL 25.6m at Steining well of Depletion Sluice of E- Saddle Dam Image Date : 11-06-2020

Back filling and Campacting at key Portion from Ch. 655m to Ch. 700m of E- Saddle Dam Image Date : 11-06-2020

Applying Coal Tar Epoxy paint on U-s side of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard of Project Site Image Date : 11-06-2020

Steel Reinforcement work at Spillway Block-24 at EL 48.76m Image Date : 10-06-2020

Concreting by Boom Placer in pier of Spillway Block-33 at EL 46.81m, Image Date : 10-06-2020

Fixing of Rock Bolts at Power House Downstream at EL 85m, Ch. 420m. Image Date : 07-06-2020

Excavation for cleaning of Loose Clay Soil at Depletion Sluice of E- Saddle Dam Image Date : 07-06-2020

Steel Reinforcement at Pier Portion of Spillway Block-26 at EL 43.48m, Image Date : 05-06-2020

Excavation in Spill Channel for laying of CC blocks ch 2780m to 2840m Image Date : 04-06-2020

Shotcreting at Power House from EL 85m to EL 95m ch 420m Image Date : 03-06-2020

Spreading of Coarse Aggregate at the base of CC Block for Spill Channel Panel L-77-48 at Ch. 1440m Image Date : 03-06-2020

Fitup of End Arm Bracing (3530X748X12mm) between bottom and second arm girder at Fabrication Yard of Project Site Image Date : 03-06-2020

Drilling at EL 72m, Ch. 485m at Power House for blasting. Image Date : 02-06-2020

Concreting by Boom Placer of Spillway B-43 at EL 50.77m, Image Date : 02-06-2020

Applying of shuttering oil for Spill Channel Panel L-168-13 ch 2470m Image Date : 01-06-2020

Concreting of Spill Channel Panel L-166-16 at ch 2460m Image Date : 01-06-2020

Vibro Compaction at Grid B-6 of Gap-II Image Date : 01-06-2020

Clearing of muck at EL 55m, Ch. 520m of Power House Image Date : 01-06-2020

Concreting using Boom Placer on Right Training Wall-2/1 of Spillway Block-2 at EL 21.00m Image Date : 31-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-28 at EL 45.80m Image Date : 30-05-2020

Reinforcement work on Left Guide Wall of Spillway at EL 19.63m Image Date : 30-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-51 at EL 47.47m Image Date : 29-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-17 at EL 48.61m Image Date : 28-05-2020

Applying Coal Tar Epoxy paint on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 28-05-2020

Applying Coal Tar Epoxy paint on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 28-05-2020

Applying Epoxy Coal Tar on sand blasted Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard 28-5-2020 Image Date : 28-05-2020

Excavation of Trench for Construction of Diaphragm Wall at proposed location of ECRF Dam (Gap-I) Image Date : 26-05-2020

Excavation and Demucking along Left Training Wall-2/6, 2/7, 2/8 & 2/9 of Spillway Block-2 Image Date : 26-05-2020

Reinforcement works in Left Training Wall-2/5 of Spillway Block-2 at EL 14.00m Image Date : 26-05-2020

Concreting using Boom Placer on Pier Portion of Spillway Block-21 at EL 48.84m Image Date : 25-05-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2500m to Ch.2600m Image Date : 25-05-2020

Excavation of Trench for Construction of Diaphragm Wall at proposed location of ECRF Dam (Gap-I) Image Date : 23-05-2020

Fitup and welding of additional vertical stiffener plate (2000x185x12)mm for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Fitup and welding of additional vertical stiffener plate (2000x185x12)mm for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Fitup and welding of additional vertical stiffener plate for strengthening bottom of Horizontal Girder at Fabrication Yard Image Date : 20-05-2020

Shuttering of Steel Reinforcement at Pier Portion of Spillway Block-21 at EL 48.84m Image Date : 19-05-2020

Shuttering on Pier Portion of Spillway Block-29 at EL 45.67m Image Date : 18-05-2020

Fixing and Welding of Embedded Plate for Hydraulic Hoist Support Structure at EL 46.32m in Spillway Block-47 Image Date : 18-05-2020

Fitup and Welding of primary embedded parts at Stoplog Gate Vertical Groove and Radial Gate Wall Groove from EL 47.62m to EL 48.62m in Spillway Block-21 Image Date : 18-05-2020

Back filling with suitable soil at Depletion Sluice of Package-62 under Right Connectivity Image Date : 16-05-2020

Shuttering on Pier Portion of Spillway Block-45 at EL 50.00m Image Date : 16-05-2020

Concreting in Spill Channel for Panel-L183/7 at Ch 2630m Image Date : 16-05-2020

Shuttering for Trunnion Beam of Spillway Block-22 at EL 34.29m Image Date : 16-05-2020

Vibro Compaction of Sand Deposit at Grid A’6 in U/s of ECRF Dam across Gap - II Image Date : 15-05-2020

Fitup & Pre-erection assembly of Arm Girder and bracing with Trunnion Hub (G-3 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 15-05-2020

Reinforcement of Pre-cast Girders at Casting Yard Image Date : 15-05-2020

Laying of Concrete for Profile Wall on U/s of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 15-05-2020

Shuttering, Reinforcement for Pre-cast I Girder at Casting Yard Image Date : 14-05-2020

Reinforcement and Shuttering work on Training Wall-2/1 of Spillway Block-2 at EL 21.00m Image Date : 14-05-2020

Laying of Coarse Aggregate Filter in Spill Channel for preparation of Bed Image Date : 14-05-2020

Concreting in Spill Channel for Panel-L181/6 at Ch 2600m Image Date : 11-05-2020

Concreting of Collar Ring beams of Depletion Sluice of Package-62 under Right Connectivity Image Date : 11-05-2020

Steel Reinforcement at Pier of Spillway Block-14 at EL 44.49m Image Date : 11-05-2020

Fixing of Rope Drum Bolts for Hoist Support Structure of P-Head Regulator of Package-62 under Right Connectivity Image Date : 10-05-2020

Concreting using Boom Placer on Right Training Wall-50/2 of Spillway Block-50 at EL 13.85m Image Date : 10-05-2020

Loading Excavated Rock Material (Debris) into Tipper at Approach Channel-1 U/s at Ch 1275m of Package-65(B) under Left Connectivity Image Date : 09-05-2020

Soil Casing work at P-Head Regulator at RL 53.65m of Package-62 under Right Connectivity Image Date : 09-05-2020

Drilling in Heading Portion of Irrigation Tunnel at Ch 2431m Image Date : 08-05-2020

Drilling of Bore Holes at Ch. 1500m at Head Regulator of Approach Channel-2 of Package-65(B) under Left Connectivity Image Date : 08-05-2020

Drilling in Heading Portion of Irrigation Tunnel at Ch 2431m of Package-65(B) under Left Connectivity Image Date : 08-05-2020

Arrangement of handpacked Rip-Rap on U/s face of E-Saddle Dam of Package-62 under Right Connectivity Image Date : 07-05-2020

Pre-ECPT work on Sand Deposit at Grid C'7 in U/s of ECRF Dam Area across Gap - II Image Date : 07-05-2020

Erection and Alignment of Trunnion Bracket with Anchor rods in Spillway Block-49 at EL 34.66m U-s and EL 35.65m D-s Image Date : 06-05-2020

Fixing and Alignment of Templates and Anchor rods for Hydraulic Hoist Support Structure at EL 47.055m in Spillway Block-3 Image Date : 06-05-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2100m to Ch.2600m Image Date : 05-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Drilling of Bore Holes at Ch. 1500m at Head Regulator of Approach Channel-2 Image Date : 04-05-2020

Loading Excavated Rock Material (Debris) into Tipper at Approach Channel-1 U/s at Ch 1275m Image Date : 04-05-2020

Loading of Excavated Rock Material (Debris) into Tipper at Approach Channel-2 U/s at Ch 1956m Image Date : 04-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Clearing of Loose Rock Materials at Ch. 490m from Power House Downstream Image Date : 04-05-2020

Erection & Alignment of Hydraulic Hoist Support Structure in Spillway Block-33 at EL 47.05m Image Date : 04-05-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-05-2020

Erection & Alignment of Hydraulic Hoist Support Structure in Spillway Block-33 at EL 47.05m 4-5-2020 Image Date : 04-05-2020

Steel Reinforcement in Trunnion Beam of Spillway Block-7 at EL 33.83m Image Date : 03-05-2020

Rip-Rap work at Upstream side of E-Saddle Dam Image Date : 30-04-2020

Rope Drum Bolts fixing at P-Head Regulator Image Date : 30-04-2020

Concreting of Ds longitudinal catch drain at EL 43.82m of Right Embankment of P-Head Regulator Image Date : 30-04-2020

Excavation of Spill Channel for laying of CC Blocks from Ch. 2100m to Ch.2600m Image Date : 29-04-2020

Survey from Ch 600m to Ch 900m at Approach Channel Image Date : 28-04-2020

Survey from Ch 600m to Ch 900m at Approach Channel-1 Image Date : 28-04-2020

Rock Drilling in Panel-2 of 3 of Left Training Wall 17.02m Image Date : 21-04-2020

Concreting in Spillway Block-49 at 46.87m Image Date : 20-04-2020

Concreting in Spillway Block-49 at 46.87m. Image Date : 20-04-2020

Concreting in Spillway Block-0 EL 35.50m Image Date : 18-04-2020

Reinforcement and Shuttering in Left Training Wall-2 of 4 of Spillway Block-2 at EL 17.05m Image Date : 17-04-2020

Shuttering and of Left Guide Wall at EL 18.55m Image Date : 16-04-2020

Concreting in Spillway Block-1 at 38.15m Image Date : 13-04-2020

Reinforcement works in Pre-cast Girders at Casting Yard Image Date : 12-04-2020

Scaffolding for Shuttering at EL 94m from Ch. 2155m to Ch. 2165m at 902 G’ Hill Image Date : 11-04-2020

Concreting in Spillway Block-34 at EL +45.03m Image Date : 11-04-2020

Concreting in Spillway Block-39 at EL +42.20m Image Date : 11-04-2020

Tying of Reinforcement in I section Spillway Bridge Girder at Casting Yard Image Date : 10-04-2020

Concreting of Outer Girder of Spillway Block 10-11 for Spillway Bridge Image Date : 09-04-2020

Concreting of Outer Girder of 10-11 for Spillway Bridge Image Date : 09-04-2020

Steel Reinforcement work for Trunnion Beam of B-29 at EL 32.96m Image Date : 08-04-2020

Excavation of Spill Channel and laying of filter materials 2500 m Image Date : 06-04-2020

Shuttering for CC Blocks of Spill Channel Panel-L 173 - 6 Image Date : 06-04-2020

Concreting of CC Blocks of Spill Channel Panel- L 173-6 Image Date : 06-04-2020

Steel Reinforcement in Trunnion Beam of Spillway Block-26 at EL 32.96m Image Date : 04-04-2020

Excavation at Approach Channel-2 Upstream at Ch 1425m Image Date : 04-04-2020

Fit-up and Welding of thrust block Embedded Parts in Spillway Block-23 at EL 46.329m and EL 45.405m Image Date : 27-03-2020

Demucking of Irrigation Tunnel at Ch.2494m Image Date : 27-03-2020

Concreting of Outer Girder for Blocks 7 and 8 of Spillway Bridge Image Date : 24-03-2020

Rip-Rap work at Downstream of P-Head Regulator Image Date : 21-03-2020

Compaction at Top Bank Level from Ch.250m to Ch.400m of E-Saddle Dam Image Date : 20-03-2020

Murrum Laying at EL +43.90m from Ch.300m to Ch.390m of E-Saddle Dam Image Date : 19-03-2020

Checking Alignment of Reinforcement and Shuttering in Spillway Block-17 Image Date : 19-03-2020

Arrival of Machinery (Hydraulic Hoist Supporting Structures) at Project Site Image Date : 19-03-2020

Erection of Hoist Support structure on Spillway Block-45 at EL +47.055m Image Date : 19-03-2020

Compaction by Needle Vibrator of CC Blocks of Spill Channel Panel-L167-5 Image Date : 17-03-2020

Drilling of Holes for Rock Anchors at Upstream Guide Wall of Spillway Image Date : 17-03-2020

Excavation of Approach Channel-1 U/s at Ch.950m Image Date : 17-03-2020

Excavation of Approach Channel-2 U/s at Ch.1350m Image Date : 17-03-2020

Loading of Excavated Rock Materials into Tipper at Approach Channel-1 U/s at Ch.750m Image Date : 17-03-2020

Drilling for Preparation of Slashing R/s at Irrigation Tunnel at Ch.2530m Image Date : 17-03-2020

Drilling for Preparation of Slashing L/s at Irrigation Tunnel at Ch.2536m Image Date : 16-03-2020

Loading of Excavated Rock Materials after blasting at Approach Channel-2 U/s at Ch.1845m Image Date : 16-03-2020

Loading of Excavated Rock Materials into Dump Truck at Power House U/s from Ch.290m to Ch.320m Image Date : 16-03-2020

Concreting at Gate Well of Depletion Sluice from EL +27.85m to EL +29.35m at E-Saddle Dam Image Date : 16-03-2020

Drilling for Preparation of Benching Blast at Irrigation Tunnel at Ch.2636m Image Date : 16-03-2020

Concreting of Outer Girder for Blocks 26 and 27 of Spillway Bridge Image Date : 15-03-2020

Concreting at Parapet Wall of P-Head Regulator Image Date : 14-03-2020

Drilling for Preparation of Heading Blast at Irrigation Tunnel at Ch.2545m Image Date : 14-03-2020

Shuttering of Gate Well at EL +29.35m at Depletion Sluice of E-Saddle Dam Image Date : 14-03-2020

Shuttering for Hand Rails at EL +53.530m at Downstream of P-Head Regulator Image Date : 14-03-2020

Rock Bolting in Irrigation Tunnel at Ch.2620m Image Date : 14-03-2020

Concreting in Hand Rail Columns at Downstream of P-Head Regulator Image Date : 13-03-2020

Revertment at RL +28.1m from Ch.270m to Ch.330m at 1st Berm of Downstream of E-Saddle Dam Image Date : 13-03-2020

Steel Binding of Inner Girders Image Date : 13-03-2020

Concreting of Hand Rail Columns (0.30.2m) at Downstream of P-Head Regulator Image Date : 13-03-2020

Dressing and Trimming of Slope at Downstream face of E-Saddle Dam from Ch.300m to Ch.350m Image Date : 12-03-2020

Rip-Rap work at Downstream of E-Saddle Dam in between Ch.130m to Ch.150m Image Date : 11-03-2020

Concreting of Inner Girder of Blocks 26 to 27 for Spillway Bridge Image Date : 09-03-2020

Applying Zinc Silicate Primer on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 08-03-2020

Shuttering of RCC Collars at Depletion Sluice of E-Saddle Dam Image Date : 06-03-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 06-03-2020

Vibro Compaction of Sand Deposit at Downstream River Bed of Diaphragm Wall for ECRF Dam across Gap – II Image Date : 06-03-2020

Concreting of Left Guide Wall in Spillway Upstream adjacent to Fish Pass at EL +15.30m Image Date : 05-03-2020

Joint Measurement of Spillway Divide Wall-18-1 Image Date : 05-03-2020

Compaction of Impervious Soil with Vibratory Roller from Ch.1560m to Ch.1660m at Upstream Coffer Dam Image Date : 04-03-2020

Laying of Impervious soil on Core Zone at EL 30.89m of Upstream Coffer Dam from Ch.1500m to Ch.1600m Image Date : 04-03-2020

Pre-ECPT work on Sand Deposit at Downstream of ECRF Dam at Grid C'14 Image Date : 03-03-2020

Sand Blasting of Horizontal Girder of Spillway Radial Gates at Fabrication Yard Image Date : 03-03-2020

Checking Discharge of Stagnant Water of Foundation Gallery of Spillway Block-26 Image Date : 03-03-2020

Restoration of Temporary Road near Divide Wall of Spillway Block-42 Image Date : 03-03-2020

Placement of Rockfill and Levelling at Upstream Coffer Dam from Ch.1520m to Ch.1600m Image Date : 02-03-2020

Compaction by Needle Vibrator at EL +34.45m of Spillway Block-1 Image Date : 01-03-2020

Compaction by Needle Vibrator at EL +43.26m of Spillway Block-17 Image Date : 01-03-2020

Bore Hole Drilling at Left Flank of Upstream Coffer Dam at Ch.48.30m for design of type of Cut-off Image Date : 01-03-2020

Applying Epoxy Coal Tar on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 01-03-2020

Extension of Anchorage cable duct 12m to 13.5mof 1st and 2nd layer at Spillway Block-13 Image Date : 01-03-2020

Cement Concreting of Blocks of Spill Channel Panel-L8-26 Image Date : 01-03-2020

Concreting on Divide Wall 18-2 of Spillway at EL +16.938m Image Date : 29-02-2020

Concreting on Spillway Block-6 at EL +35.230m Image Date : 29-02-2020

Concreting of Spillway Block-50 at EL +38.057m Image Date : 29-02-2020

Cleaning of Loose Rock Materials at Power House at Ch.200m Image Date : 29-02-2020

Fit-up of Embedded Parts for Radial Gate or Stoplog Gate LHS & RHS in Spillway Block-32 at EL +45.405m Image Date : 29-02-2020

Dressing and Slope trimming on D/s face of E-Saddle Dam at Ch.500m to Ch.540m Image Date : 29-02-2020

Compaction by Needle Vibrator at Spillway Block-27 at EL +41.988 m Image Date : 28-02-2020

Bhoomi Pooja at Spill Channel to start Concreting on Panel-L 9-26 at Ch.460m Image Date : 28-02-2020

Plain Cement Concreting on Panel-L 9-26 of Spill Channel at Ch.460m Image Date : 28-02-2020

Backfill Concreting of Block-1 of Spillway at EL +34.381m Image Date : 27-02-2020

Drilling at Power House Upstream for Excavation of Rock by Blasting at Ch.335m Image Date : 27-02-2020

Concreting of Steining Well of Depletion Sluice in E-Saddle Dam Image Date : 27-02-2020

Cleaning of Reinforcement of Divide Wall 18/5 of Spillway at EL +16.3m Image Date : 26-02-2020

Shuttering for Chute at Downstream Side of P-Head Regulator Image Date : 25-02-2020

Shuttering of Steining Well of Depletion Sluice in E-Saddle Dam Image Date : 25-02-2020

Fine Filter permeability Test at Upstream Side of Upstream Coffer Dam at Ch.1350m Image Date : 25-02-2020

Checking of Reinforcement of Spillway Block-18-1 at EL +14.95 m. (Divide Wall) Image Date : 18-02-2020

Excavation of Approach Channel-1 Upstream at Ch.750m of Package-65(B) Image Date : 15-02-2020

Excavation of Approach Channel-2 Upstream at Ch.1350m Image Date : 15-02-2020

Removal of Loose Rock Materials at Approach Channel-2 Upstream at Ch.1950m Image Date : 15-02-2020

Removal of Loose Rock Materials after Heading Blast at Irrigation Tunnel at Ch.2557m of Package-65(B) Image Date : 15-02-2020

Excavation in Heading of Irrigation Tunnel of Package-65(B) Image Date : 15-02-2020

Drilling for Benching in Irrigation Tunnel of Package-65(B) Image Date : 15-02-2020

Reinforcement in Gallery Portion of Spillway Block-51 at EL +34.85 m Image Date : 14-02-2020

Shuttering of Pier of Spillway Block-40 at EL + 38.39 m Image Date : 14-02-2020

Reinforcement and Shuttering of Pier of Spillway Block-14 at EL +36.908 m Image Date : 13-02-2020

Status of Spillway Block-26 before start of Concreting at EL +34.773 m Image Date : 13-02-2020

Inspection of Hoist Support Arrangement for Radial Gates on SpillwayBlock-43 at EL +47.055 m Image Date : 11-02-2020

Binding of Reinforcement of Spillway Block-18-2 at EL +16.398 m.(Divide Wall) Image Date : 11-02-2020

Checking of Reinforcement details of Spillway Block-6 at EL +38.04m Image Date : 09-02-2020

Bore Hole with Cores for finalization of Cut-off at Left Flank of Upstream Coffer Dam at Ch.(-)10m Image Date : 09-02-2020

Inspection of Hoist Support Structure on Spillway Block-43 at EL +47.055 m Image Date : 07-02-2020

Extension of Anchorage Cable Duct of size 12 to 13.5 m of 1st and 2nd layer at Spillway Block-13 Image Date : 07-02-2020

Joint Measurement of Spillway Block Levels Image Date : 07-02-2020

Erection of Hoist Support structure on Spillway Block-43 at EL +47.055 m Image Date : 06-02-2020

Welding of Arm Girder Bracing (G-05 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 05-02-2020

Rock Density Test on Downstream Side of Upstream Coffer Dam at Ch.693m Image Date : 05-02-2020

Excavation for laying of MS pipe at culvert of Right Flank of Upstream Cofferdam Image Date : 04-02-2020

Fit-up and Welding of Primary EM parts at Stoplog Gate vertical groove on Spillway Block-32 at EL +44.98 m Image Date : 04-02-2020

Applying Zinc Silicate Primer on Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 04-02-2020

Fit-up of Walkway Base Plate in Spillway Block-4 at EL +33.4m Image Date : 03-02-2020

Sand Blasting of Skin Plate Leaf of Spillway Radial Gates at Fabrication Yard Image Date : 03-02-2020

Pre ECPT work on Downstream of ECRF at Grid No.C'11 Image Date : 03-02-2020

Vibro-Compaction on Downstream side of Diaphragm Wall (Gap – II) at Grid No.C’10 Image Date : 02-02-2020

Fit-up of Arm Girder Bracing (G-5 LH) of Spillway Radial Gates at Fabrication Yard Image Date : 02-02-2020

Fit-up and Welding of thrust block Embedded Parts in Spillway Block-47 at EL+35.5m Image Date : 01-02-2020

Welding of End Arm Bracing of Spillway Radial Gates at Fabrication Yard Image Date : 01-02-2020

Core cutting test in Core Zone of Upstream Coffer Dam at Ch.800m Image Date : 01-02-2020

Inspection of Right Side Guide Wall Image Date : 01-02-2020

Test-2 Image Date : 10-01-2018